Invitation To Bid

To access this project and plans:
Project Details:
DCNR Union Co Bridge Replacement Stony Run Rd. over Stony Run - Woodward, Pennsylvania
Bid Date: March 15, 2021
Bid Time: 12:00 pm - Eastern Time Zone (ET)
Instructions to Bidders:
Please email all bids to: mmiller@redrockconstruction.com
Description:
Demolition of existing structure consisting of a single span concrete slab bridge on stone masonry abutments. The existing bridge has a 7.18’ clear span and 5.34’ underclearance. It will be replaced with a single span composite prestressed concrete adjacent plank beam bridge with geosynthetic reinforced soil abutments with a 20’-8” clear roadway width. The replacement bridge will have a 18’-6” normal span between abutment faces and a 5’-6” minimum hydraulic underclearance at the inlet, centerline of stream. Replacement includes driving surface aggregate, rock lining, and guiderail including end treatments.
Trades:
0201 Clearing and Grubbing
0620 Guide Rail
0686 Surveying
0804 Seeding, Mulching, and Landscaping
0850 Rock
0867 Filter Sock
0901 Maintenance and Protection of Traffic
1002 Epoxy Coated Rebar
1018 Bridge Demolition
8110 Bridge Materials
8110 Crane Service
9000 Temporary Pump Bypass
To access this project and plans: